General questions
View pageWhat kinds of projects does CH3 build?
Corporate, commercial and logistics projects, as well as building retrofits. We work from the architectural design to handing over the space ready to operate.
This question's pageDoes CH3 handle both the design and the construction?
Yes. In the Turnkey model, architecture, engineering and construction stay with the same team, in a single contract. CH3 also builds the designs of partner architecture firms.
This question's pageDoes CH3 also transform existing buildings?
Yes. Our retrofits upgrade infrastructure and common areas, planned to work in occupied buildings, as at CENU Torre Norte.
This question's pageHow do I get in touch about a new project?
Through the contact form, by email or on WhatsApp. Our sales team gets back to you to understand the scope, the timeline and the best financial structure.
This question's pageWhat is BTR3?
BTR3 stands for Built to Rent. It is CH3's solution that brings engineering and financing together in a single contract, with the build paid in up to 10 interest-free installments or over up to 60 months, subject to review.
About CH3
View pageWhat kinds of projects does CH3 build?
Corporate, commercial and logistics projects, as well as building retrofits. We work from the architectural design to handing over the space ready to operate.
This question's pageWhen was CH3 founded?
CH3 was founded in 2009, specializing in logistics parks. Its origins lie in a family group that has been developing, building and managing its own real estate assets since the 1980s.
This question's pageHow can I see the projects CH3 has built?
On the Projects page you'll find CH3's portfolio, where you can search by name or filter by category and contract model. Each project brings together information and images of the build.
This question's pageProjects
View pageHow do I find a project in the portfolio?
Use the search field to look up a name, or select a project type and a delivery model. Click Filter to update the results. The Clear filters option shows the full portfolio again.
This question's pageDo I need to change pages to see all the projects?
No. The projects are shown on the same page, grouped by project type. With no filters active, the category buttons take you straight to the matching section.
This question's pageWhere can I see more information and photos of a project?
Open the project from its card in the portfolio. The page brings together the description, the available details and images of the build. When there is related content, it also shows testimonials and articles about that project.
This question's pageBTR3
View pageHow do I choose the right option for my company?
The Turnkey Project combines the design and delivery of a ready-to-use space in a single contract. Sale & Leaseback frees up the capital in your property while you keep using it through a lease. Full Outsourcing includes acquiring the asset, renovating it and providing basic maintenance services. The choice depends on the property, your need for capital and how much of the management your company wants to centralize with CH3.
This question's pageWhat kinds of projects can use BTR3?
CH3 can evaluate new construction, renovations, retrofits and expansion projects, including corporate and commercial spaces. The solution and the terms depend on the scope of each project.
This question's pageDo Lucro Real companies get tax benefits?
The model may offer tax benefits, depending on how the transaction is structured and on your company's tax classification. Paying in installments does not, on its own, determine the accounting or tax treatment. The assessment should take into account the contract and the guidance of your company's accounting team.
This question's pageWhat is CH3's BTR3 model?
It is CH3's model that brings engineering and CH3's own capital together in a single contract and lets you pay for the build in installments over up to 60 months. The goal is to make the project easier to carry out without front-loading the entire outlay.
This question's pageHow does BTR3 combine with Turnkey?
Turnkey centralizes the project's development and construction up to the handover of a space ready to use. BTR3 adds the option of paying for that investment in installments, bringing the construction and the financial structure into the same contract.
This question's pageDoes BTR3 replace bank financing?
Yes. The transaction is made directly with CH3, with its own funds and a single contract for the build and the financing, with no need to seek credit from a bank.
Blog
View pageWhat topics does CH3's blog cover?
The blog brings together news and insights on projects, architecture and construction, including CH3's own projects and updates.
This question's pageHow do I search for an article or topic?
Type a title or topic in the Search articles field and click Search. To go back to the list without that term, use Clear search.
This question's pageHow do I find older articles?
Use the navigation at the end of the list to reach the blog's other pages. If a search is active, the navigation keeps the search term.
This question's pageCorporate neuroarchitecture: how the workplace shapes performance, mental health and team behavior
View pageWhat is corporate neuroarchitecture?
It is designing the office around how the brain responds to its surroundings: light, sound, color, volume and texture. Beyond how many people fit and what image the space conveys, it asks how the environment affects the way people think, feel and work.
How do office colors affect teams?
Soft, balanced tones make concentration easier and reduce visual fatigue. Vibrant colors, used at strategic points, stimulate energy and interaction. In neuroarchitecture, the secret is balance.
What does NR1 have to do with office design?
NR1, Brazil's regulation on occupational risk management, covers ergonomic and psychosocial risks and calls for spaces with comfort, accessibility, good lighting, good acoustics and furniture suited to the work. A neuroarchitecture project meets those requirements and turns them into experience.
Expansion partnerships and franchise attraction
View pageHow does CH3 support franchise network expansion?
CH3 combines, in a single contract, BTR3 financing for the build, end-to-end Turnkey management and Plug and Play delivery. The franchisee preserves capital, the brand standard is maintained and the unit opens ready to operate.
This question's pageWhat does BTR3 change for franchisees?
CH3 finances the build directly, under the same contract as the construction, and spreads out the burden of the upfront capex. The franchisee invests its capital in operations and speeds up the unit's payback.
This question's pageWhat is CH3's Plug and Play delivery?
It is a unit delivered with all its infrastructure installed: office furniture, data network and IT. The franchisee plugs in its operation and starts generating revenue on the first business day.
This question's pageCorporate retrofit: the strategy that turns properties into competitive assets
View pageDoes CH3 also transform existing buildings?
Yes. Our retrofits upgrade infrastructure and common areas, planned to work in occupied buildings, as at CENU Torre Norte.
This question's pageWhat is a corporate retrofit?
It is the modernization of an existing building to adapt its spaces and systems to what companies need today. The work combines engineering, architecture and operations planning, while preserving elements such as the structure and the architectural identity.
This question's pageWhat factors guide the decision to retrofit?
The article highlights the time needed to bring the property back to market, the balance between investment and operating costs, and the asset's gain in value. Updating building systems, common areas and workspaces can contribute to these goals.
This question's pageCan a retrofit be carried out in an occupied building?
Yes. The retrofit of the common areas at CENU Torre Norte is one example presented in the article. In that situation, planning the work has to take safety into account and keep disruption to the occupants' routines to a minimum.
This question's pageThe high-performance engineering behind Champions League Experience Brasil
View pageWhere is Champions League Experience Brasil, built by CH3?
The venue is at Shopping Market Place, a mall in southern São Paulo. It covers 2,000 m² over two floors and a rooftop, with architectural design by Jayme Lago Mestieri Arquitetura.
This question's pageWhat spaces make up Champions League Experience Brasil?
The venue brings together a restaurant, sports bar, interactive UEFA tunnel, activation field, auditorium, rooftop, official store and kids' area. The concept combines entertainment, dining and retail.
This question's pageWhat were the main technical challenges of this build?
Construction required integrating electrical systems, HVAC, lighting, audiovisual and scenography inside an operating mall. The kitchen also received dedicated electrical infrastructure and hood and exhaust systems to serve the dining operation.
This question's pageBTR3: how CH3 turns construction costs into installments and redefines capex
View pageWhat is CH3's BTR3 model?
It is CH3's model that brings engineering and CH3's own capital together in a single contract and lets you pay for the build in installments over up to 60 months. The goal is to make the project easier to carry out without front-loading the entire outlay.
This question's pageHow can BTR3 help modernize commercial properties?
Paying in installments lets owners spread the investment in upgrading a property over time. The article presents retrofits as one application of the model, preparing existing spaces for new tenants.
This question's pageHow does BTR3 combine with Turnkey?
Turnkey centralizes the project's development and construction up to the handover of a space ready to use. BTR3 adds the option of paying for that investment in installments, bringing the construction and the financial structure into the same contract.
This question's pageCH3 builds Grupo Tellescom's new headquarters at Market Place Tower
View pageHow large is Grupo Tellescom's new headquarters?
The headquarters occupies three floors of the Market Place Tower II building in São Paulo, totaling 3,000 m². It was designed by Ricardo Rossi Arquitetura and built by CH3.
This question's pageHow do the spaces at the headquarters encourage social interaction and meetings?
The design brings together lounges, social areas and meeting rooms integrated with greenery. On the 7th floor, the living area with a garden, a water curtain, a bar and a piano was designed to receive clients, partners and company leaders.
This question's pageWhat facilities were built for N Sports?
The 5th floor has a lounge, workstations, a meeting room, a podcast studio and booths for announcers and commentators. The production spaces received acoustic treatment to keep activities separate and the audio consistent.
This question's pageCH3 brings teaching and clinical care together in a Turnkey project for Mandic, a private dental and medical school in Brazil
View pageWhat did CH3 build for São Leopoldo Mandic?
CH3 built a 2,200 m² medical graduate school headquarters in the Passeio Paulista building on Rua da Consolação in São Paulo. The project combines academic facilities and a clinical center.
This question's pageWhat spaces make up Mandic's new headquarters?
The facility has five classrooms, a faculty room, social areas and a kitchenette, plus 25 treatment rooms and five triage and procedure rooms. The design also includes an integrated reception and waiting area.
This question's pageHow did the project reconcile teaching and patient care?
The solution included sound insulation between classrooms and treatment rooms, zoned HVAC and planned circulation for students, patients and staff. CH3 handled design, management and construction under the Turnkey model.
This question's pageCH3 drives the expansion of Grupo Mendes Chaves with a new fitness complex at Pátio Guedala
View pageWhich brands are in the Pátio Guedala fitness complex?
The venue brings together AERA Pilates, Tonus Gym and Race Bootcamp. The three brands share a 650 m² space spread over three floors at Pátio Guedala in São Paulo.
This question's pageHow long did it take to build the fitness complex?
Construction took 120 days. The work sought to preserve each brand's identity within the complex.
This question's pageWhat solutions allowed the different workouts to coexist?
CH3 applied sound insulation solutions for the different workout intensities, along with thermal comfort systems and theatrical lighting suited to the atmosphere of each studio.
This question's pageHow the Varanda Cidade Jardim building became a hub for modern offices with CH3
View pageWhat defines the Plug and Play office at Varanda Cidade Jardim?
It is a space delivered ready to use, with infrastructure, furniture, HVAC, lighting and finishes. The model floor CH3 delivered in October 2024 started the run of projects described in the article.
This question's pageWhich projects at Varanda Cidade Jardim does the article feature?
Besides the model floor, the article highlights an office suite with meeting rooms facing the city view, the CMA Advogados office and a 200 m² office for a real estate company.
This question's pageHow was the CMA Advogados office developed?
The 900 m² office was built in partnership with Scala Arquitetura and keeps the visual language of the firm's Rio de Janeiro headquarters. It includes open-plan workstations, modular meeting rooms, a reception, breakout areas and a balcony.
This question's pageCH3 delivers a model office at CENU Torre Norte in São Paulo
View pageWhat is the floor area of the model office built in CENU Torre Norte?
The office occupies 1,250 m² in CENU Torre Norte, at Avenida das Nações Unidas, 12901, in São Paulo.
This question's pageWhat spaces were included in the model office?
The design brings together 80 open-plan workstations, brainstorming rooms, directors' offices, phone booths, collaborative areas and a kitchenette.
This question's pageWhat was the fit-out timeline, and which model was used?
The fit-out took 90 days, under the Plug and Play format. In this model, the space is prepared so the occupant can start using it with the office already in place.
This question's pageCasas Bahia Berrini megastore: built in record time
View pageWhere is the Casas Bahia Berrini megastore, and how big is it?
The store is in the Centenário building, in the Berrini area of São Paulo. It covers 3,300 m² over two floors.
This question's pageWhat was the scope of the megastore build?
The work included a retrofit, fit-out of the interior spaces, structural reinforcement, technical upgrades and a new staircase between the floors. The job also covered building systems and finishes for brand areas, gourmet spaces and interactive experiences.
This question's pageHow did CH3 organize a 45-day delivery?
The build brought in more than 100 suppliers working at the same time. Meeting the deadline took careful scheduling and technical and operational coordination of the different trades.
This question's pageHow can a commercial development reflect a company's identity and personality? Take a look at Grupo We's new headquarters
View pageWhat is the floor area of the Grupo We and LVL headquarters built by CH3?
The project covers 3,800 m² across six floors of a single-tenant building. It was delivered in four months.
This question's pageHow does the architecture express the agencies' identity?
The design combines high ceilings and exposed concrete and slab with intense colors on each floor. The spaces were defined from a briefing on the companies' values, goals and daily routine.
This question's pageWhat spaces were created for collaboration between teams?
The headquarters brings together the Welcome Lounge, open meeting areas, the Townhall with a gourmet area and event space, the executive board's lounge and coffee stations on each floor. The integrated open-plan area has room for more than 300 people.
This question's pageCH3 boosts retail in southern São Paulo: meet Pátio Guedala
View pageWhere is Pátio Guedala, the shopping center in the article?
The shopping center is at the junction of Morumbi and Adibo Aires avenues, in Jardim Guedala, southern São Paulo. The architectural design is by Jayme Lago Mestieri Arquitetura and the construction by CH3.
This question's pageWhat is the planned size of Pátio Guedala?
The article describes a 16,000 m² build over two floors, with room for more than 20 stores and restaurants. The design includes 300 parking spaces.
This question's pageWhich building systems are part of the Pátio Guedala build?
The scope includes electrical and plumbing systems, HVAC, security and fire protection systems and restroom automation. It also covers surface materials, finishes and a structure prepared for escalators and elevators.
This question's pageGrupo Band RS's new headquarters at TecnoPUC
View pageWhere was the new Band RS headquarters built?
The headquarters is in Building 50 at TecnoPUC, in Rio Grande do Sul, and covers 900 m². It was designed by MMAC Arquitetura and built by CH3.
This question's pageWhat production spaces were built for Band RS?
Two radio studios were built, for Band News FM and Rádio Bandeirantes, along with three TV studios, a newsroom and office spaces.
This question's pageWhat technical measures did the studios require?
The studios received acoustic treatment on walls, ceilings and partitions. The infrastructure also provided for redundancy of essential systems such as HVAC, electrical, the generator set and transmission antennas.
This question's pageThe first phase of the São Lourenço II logistics complex has been delivered
View pageWhere is the São Lourenço II logistics complex?
The development is in Nova Odessa, in inland São Paulo state, at km 118 of the Anhanguera highway. The first phase opened in September 2022.
This question's pageWhat was CH3's role in the São Lourenço II complex?
CH3 was involved from the feasibility studies and phased planning through to approvals and delivery of the project. The first phase includes a logistics warehouse with more than 80,000 m² of built area.
This question's pageWhat environmental solutions were built into the complex?
The design included water reuse, natural ventilation and the use of natural light. In the first phase, approximately 140,000 m² was also reforested, with 12,000 native tree seedlings planted.
This question's pageSalone del Mobile.Milano 2023: employee well-being
View pageWhat well-being trends appeared at Salone del Mobile 2023?
The article highlights ergonomics, acoustic comfort, multifunctional furniture, soft colors and natural materials. Greenery was also a recurring feature of the proposals for workspaces.
This question's pageHow were acoustic solutions built into furniture and decor?
Examples include the SnowPouf, by Paola Navone for Caimi, covered in a sound-absorbing fabric, and Slalom's panels. The proposals combine acoustic function, fabrics, colors and the design of the pieces.
This question's pageHow was greenery used in the spaces on display?
Plants appeared built into Fantoni's modular furniture, in La Palma's lounges and relaxation areas and in True Design's shelving compositions.
This question's pageSalone del Mobile.Milano 2023: the hybrid, flexible office
View pageHow does the furniture shown in Milan keep up with hybrid work?
The designs explore modular, multifunctional and compact pieces, with attention to ergonomics. The idea is to allow different uses in offices and in work spaces at home.
This question's pageWhich modular solutions are highlighted?
The article presents Arper's Ralik line, with sofas, benches, poufs and side tables, and La Palma's Plus line. It also highlights Fantoni's Panorama system, designed by UNStudio, for individual work, collaboration and informal meetings.
This question's pageWhat role do phone booths play in open-plan offices?
Phone booths offer a space for individual or small-group privacy in open-plan areas and coworking spaces. The article cites solutions from Tecno and Fantoni.
This question's pageRevestir and DW in São Paulo
View pageWhich design events did the CH3 team attend in São Paulo?
CH3's team of architects attended the 21st Revestir and DW! Design Week, both held in the same week. The visit gathered references in surface materials, furniture, faucets and fittings and other materials for its projects.
This question's pageWhich trends caught the team's attention at these events?
Highlights include reliefs and textures, color, botanical references and large formats. The team also noticed faucets and fittings with a minimalist design, colorful sinks and toilets, and furniture pieces by Brazilian designers.
This question's pageTechnical challenges in residential construction
View pageWhat was the structural challenge of the house in the article?
The original design called for an all-steel structure. When the price of steel rose, the technical team re-evaluated the system to preserve the architectural concept and reduce the cost of that item.
This question's pageWhat changes were made to the construction system?
The steel structure was replaced with a composite concrete and steel solution, cutting the cost of that item by about 60%, according to the project report. The concrete masonry gave way to aerated concrete blocks to reduce the overall weight.
This question's pageWhat resource-saving solutions were planned for the house?
The house was designed to accommodate photovoltaic panels and a water reuse system for cleaning and garden irrigation.
This question's pageAcoustic design: the art of sound
View pageAt what stage should acoustic comfort be built into an office design?
The article recommends considering acoustics from the start of planning. That way the solutions can be coordinated with the layout, avoiding more complex interventions later on.
This question's pageWhat acoustic solution did CH3 use on the APR Seguros build?
CH3 used Trisoft acoustic clouds, PET wool panels mounted on the ceiling. The solution combines sound absorption with the design of the space's suspended elements.
This question's pageThe challenges facing facilities managers
View pageHow does hybrid work expand the role of facilities management?
Beyond keeping spaces and services running, facilities management takes part in discussions about office occupancy and teams' needs. That means understanding when being on site makes sense and which spaces support that routine.
This question's pageWhat should managers consider when replanning the office?
The article suggests assessing the different experiences of working from home, the costs of keeping an office and how to organize when teams come in. It also highlights occupancy management and the quality of the experience in the physical space.
This question's pageWhat kinds of changes can support the return to the office?
The article mentions partial or full renovations, moves to new headquarters and the creation of social areas. In one of the projects described, CH3 installed relaxation areas, a gourmet area and leisure spaces.
This question's pageValue engineering to optimize construction costs
View pageHow can value engineering help control the cost of a build?
It makes it possible to reassess structural, material and finish solutions in light of the budget and the project's needs. The alternatives must take into account quality, look, schedule and client approval.
This question's pageWhat factors need to be weighed when replacing a material?
The analysis should weigh the material's cost together with suppliers, labor and construction time. It also needs to check that the alternative keeps the intended function and appearance.
This question's pageIs removing a column always the best way to open up a space?
No. The article uses this example to show that removing a column may require a new structural solution and raise costs. The team should study alternatives that meet the design's needs on schedule and on budget.
This question's pageConnection: biophilic design and neuroarchitecture
View pageHow does the article connect biophilic design and neuroarchitecture?
The article links the study of how people relate to their surroundings with the presence of natural elements in the built environment. In the office, this connection guides proposals for making spaces more welcoming.
This question's pageWhat elements can be part of an office with biophilic design?
The article cites vegetation, images of plants, organic shapes, earthy tones, decorative water features and natural light. It also includes surface materials that evoke wood.
This question's pageAccessibility in the office
View pageWhat is the goal of office accessibility?
The goal is to make everyday use of the space easier for people with different needs, promoting independence and inclusion. The article treats this as part of planning new offices and adapting existing ones.
This question's pageHow can CH3 help make an office more accessible?
The work described covers developing designs and carrying out construction and remodeling of workspaces. The focus is on building accessibility solutions into corporate spaces.
This question's pageFacilities: post-construction services
View pageWhat are CH3's post-construction facilities services?
They are maintenance services that continue caring for the office after the construction is delivered. The idea is to bring these needs together under a single point of contact to support the client's operations.
This question's pageWhat is the difference between the preventive and corrective plans?
In the format described in the article, preventive maintenance is recurring, with monthly visits. Corrective maintenance handles one-off needs through on-demand visits.
This question's pageWhat types of maintenance does the article mention?
The preventive plan covers electrical, HVAC, millwork, painting and general building work. The corrective plan covers electrical, plumbing, window and door frames and metalwork, painting, and floors and coverings.
This question's pageTurnkey at CH3
View pageDoes CH3 handle both the design and the construction?
Yes. In the Turnkey model, architecture, engineering and construction stay with the same team, in a single contract. CH3 also builds the designs of partner architecture firms.
This question's pageHow long has CH3 used the Turnkey concept?
CH3 has applied the Turnkey concept to its projects since it began operating, according to the history presented in the article.
This question's pageJurassic Park Burger
View pageWhat experience does the Jurassic Park Burger article highlight?
The highlight is fans' encounter with a T-Rex replica, described in the article as 1.70 m tall, as part of the experience inspired by Jurassic Park.
This question's pageGetting to know CH3
View pageWhen was CH3 founded?
CH3 was founded in 2009, specializing in logistics parks. Its origins lie in a family group that has been developing, building and managing its own real estate assets since the 1980s.
This question's pageDidn't find your question? Let's talk.
Tell CH3 what your company needs to build. Let's think through the next steps together.